Thread Subject: Meeting Schedule Collision

Note

This archival content is maintained by WebAIM and NCDAE on behalf of TEITAC and the U.S. Access Board . Additional details on the updates to section 508 and section 255 can be found at the Access Board web site.

Return to this mailing list's archives

From: Rex Lint
Date: Mon, Nov 06 2006 4:12 PM
Subject: Meeting Schedule Collision

The calendar shows 2 meetings I'm planning on attending today happening at
the same time (see http://teitac.org/calendar/). Chairs - please negotiate
these and change one of them? Thanks,

Rex

Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

From: Andi Snow-Weaver
Date: Mon, Nov 06 2006 4:13 PM
Subject: Re: Meeting Schedule Collision

Rex,

I think this happened because the Telecommunications SC meeting for today
was not on the master calendar when I set up today's Web and Software SC
meeting on the 24th. I think this is a one-time collision. Web and Software
will normally be meeting on Wednesdays and is only meeting today because of
the TEITAC meeting conflict on Wednesday.

I apologize for the conflict but I think it is too late to change because
of the captioning that has been scheduled and because of the TEITAC meeting
this week.

Andi




"Rex Lint"
< = EMAIL ADDRESS REMOVED = >
Sent by: To
teitac-committee- "'TEITAC Audio/Video Subcommittee'"
= EMAIL ADDRESS REMOVED = < = EMAIL ADDRESS REMOVED = >,
ac.org "'TEITAC Telecommunications
Subcommittee'"
< = EMAIL ADDRESS REMOVED = >,
11/06/2006 06:29 "'TEITAC Committee'"
AM < = EMAIL ADDRESS REMOVED = >
cc

Please respond to Subject
TEITAC Committee [teitac-committee] Meeting Schedule
<teitac-committee Collision
@list.teitac.org>









The calendar shows 2 meetings I'm planning on attending today happening at
the same time (see http://teitac.org/calendar/). Chairs - please negotiate
these and change one of them? Thanks,

Rex

Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

From: Andi Snow-Weaver
Date: Mon, Nov 06 2006 4:13 PM
Subject: Re: Meeting Schedule Collision

Rex,

I think this happened because the Telecommunications SC meeting for today
was not on the master calendar when I set up today's Web and Software SC
meeting on the 24th. I think this is a one-time collision. Web and Software
will normally be meeting on Wednesdays and is only meeting today because of
the TEITAC meeting conflict on Wednesday.

I apologize for the conflict but I think it is too late to change because
of the captioning that has been scheduled and because of the TEITAC meeting
this week.

Andi




"Rex Lint"
< = EMAIL ADDRESS REMOVED = >
Sent by: To
teitac-committee- "'TEITAC Audio/Video Subcommittee'"
= EMAIL ADDRESS REMOVED = < = EMAIL ADDRESS REMOVED = >,
ac.org "'TEITAC Telecommunications
Subcommittee'"
< = EMAIL ADDRESS REMOVED = >,
11/06/2006 06:29 "'TEITAC Committee'"
AM < = EMAIL ADDRESS REMOVED = >
cc

Please respond to Subject
TEITAC Committee [teitac-committee] Meeting Schedule
<teitac-committee Collision
@list.teitac.org>









The calendar shows 2 meetings I'm planning on attending today happening at
the same time (see http://teitac.org/calendar/). Chairs - please negotiate
these and change one of them? Thanks,

Rex

Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

From: Weinstein, Michael
Date: Mon, Nov 06 2006 4:14 PM
Subject: Re: Meeting Schedule Collision

Rex,

Do we have an ITAA Section 508 working group meeting today?


Michael Weinstein, Esq.
Contract Administrator
Systems Research and Applications Corporation, a wholly owned subsidiary
of SRA International, Inc.
3434 North Washington Boulevard
Arlington, VA 22201
(P) 703-284-6165
(F) 703-284-1370
Email: = EMAIL ADDRESS REMOVED =

From: Brooner Mary-AMB004
Date: Mon, Nov 06 2006 4:14 PM
Subject: Re: Meeting Schedule Collision

It is my view that we "tolerate" for today the double schedule and that
when we meet this week as plenary, the various chairs can try to get
some clarity on schedules for the next few months. Telecomm subcomm.
Has agreed to hold Mondays at 2 pm as a standing time for its meetings.
We are hoping this can hold going forward.

Thank you.

Mary Brooner

-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Brett,
Thomas F
Sent: Monday, November 06, 2006 7:50 AM
To: TEITAC Telecommunications Subcommittee; TEITAC Audio/Video
Subcommittee; TEITAC Committee
Cc: Baquis David; Creagan Tim; Bailey Bruce
Subject: Re: [teitac-committee] [teitac-telecom] Meeting Schedule
Collision

Please bear this in mind, both of these meetings have FEDRCC scheduled.
These reservations can be cancelled but not changed at this late date.
By rescheduling these meeting for a different time today would mean that
one would not have accessibility. The earliest that they could be
rescheduled is Wednesday.

Tom Brett,
Section 508 Coordinator
US Office of Personnel Management
Rm 6H34A
2026061206 (v)
2026062582 (tty)
Disabled does not mean Unable
= EMAIL ADDRESS REMOVED =

-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Rex Lint
Sent: Monday, November 06, 2006 7:30 AM
To: 'TEITAC Audio/Video Subcommittee'; 'TEITAC Telecommunications
Subcommittee'; 'TEITAC Committee'
Subject: [teitac-telecom] Meeting Schedule Collision

The calendar shows 2 meetings I'm planning on attending today happening
at the same time (see http://teitac.org/calendar/). Chairs - please
negotiate these and change one of them? Thanks,

Rex

Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

From: Brett, Thomas F
Date: Mon, Nov 06 2006 4:14 PM
Subject: Re: Meeting Schedule Collision

I found the following information on the WIKI for Telecomm. Has an
captioning event bee set up for these dates?





Mon Nov 13 2pm - 3pm

Toll-Free Dial-In Number: 877.825.8522

Pin: 0835477

RCC: TBA



Mon Nov 27 2pm - 3pm

Toll-Free Dial-In Number: 877.825.8522

Pin: 0835477

RCC: TBA



Tom Brett,

Section 508 Coordinator

US Office of Personnel Management

Rm 6H34A

2026061206 (v)

2026062582 (tty)

Disabled does not mean Unable

= EMAIL ADDRESS REMOVED =



-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Brooner
Mary-AMB004
Sent: Monday, November 06, 2006 9:46 AM
To: TEITAC Committee; TEITAC Telecommunications Subcommittee; TEITAC
Audio/Video Subcommittee
Cc: Baquis David; Creagan Tim; Bailey Bruce
Subject: Re: [teitac-telecom] [teitac-committee] Meeting Schedule
Collision



It is my view that we "tolerate" for today the double schedule and that

when we meet this week as plenary, the various chairs can try to get

some clarity on schedules for the next few months. Telecomm subcomm.

Has agreed to hold Mondays at 2 pm as a standing time for its meetings.

We are hoping this can hold going forward.



Thank you.



Mary Brooner



-----Original Message-----

From: = EMAIL ADDRESS REMOVED =

[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Brett,

Thomas F

Sent: Monday, November 06, 2006 7:50 AM

To: TEITAC Telecommunications Subcommittee; TEITAC Audio/Video

Subcommittee; TEITAC Committee

Cc: Baquis David; Creagan Tim; Bailey Bruce

Subject: Re: [teitac-committee] [teitac-telecom] Meeting Schedule

Collision



Please bear this in mind, both of these meetings have FEDRCC scheduled.

These reservations can be cancelled but not changed at this late date.

By rescheduling these meeting for a different time today would mean that

one would not have accessibility. The earliest that they could be

rescheduled is Wednesday.



Tom Brett,

Section 508 Coordinator

US Office of Personnel Management

Rm 6H34A

2026061206 (v)

2026062582 (tty)

Disabled does not mean Unable

= EMAIL ADDRESS REMOVED =



-----Original Message-----

From: = EMAIL ADDRESS REMOVED =

[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Rex Lint

Sent: Monday, November 06, 2006 7:30 AM

To: 'TEITAC Audio/Video Subcommittee'; 'TEITAC Telecommunications

Subcommittee'; 'TEITAC Committee'

Subject: [teitac-telecom] Meeting Schedule Collision



The calendar shows 2 meetings I'm planning on attending today happening

at the same time (see http://teitac.org/calendar/). Chairs - please

negotiate these and change one of them? Thanks,



Rex



Rex Lint, Consultant

Chair, Section 508 Working Group

Information Technology Association of America

PH: 603-860-7651, FAX: 603-882-6612

From: Brett, Thomas F
Date: Mon, Nov 06 2006 4:15 PM
Subject: Re: Meeting Schedule Collision

Andi...since the meetings will be held on Wednesday, will the telephone
# and time be the same? If so I can set up a Captioning event far in
advance and then that could be added to the WIKI calendars.

Tom Brett,
Section 508 Coordinator
US Office of Personnel Management
Rm 6H34A
2026061206 (v)
2026062582 (tty)
Disabled does not mean Unable
= EMAIL ADDRESS REMOVED =

-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Andi
Snow-Weaver
Sent: Monday, November 06, 2006 9:41 AM
To: TEITAC Committee
Cc: 'TEITAC Telecommunications Subcommittee'; 'TEITAC Audio/Video
Subcommittee'
Subject: Re: [teitac-video] [teitac-committee] Meeting Schedule
Collision

Rex,

I think this happened because the Telecommunications SC meeting for
today
was not on the master calendar when I set up today's Web and Software SC
meeting on the 24th. I think this is a one-time collision. Web and
Software
will normally be meeting on Wednesdays and is only meeting today because
of
the TEITAC meeting conflict on Wednesday.

I apologize for the conflict but I think it is too late to change
because
of the captioning that has been scheduled and because of the TEITAC
meeting
this week.

Andi





"Rex Lint"

< = EMAIL ADDRESS REMOVED = >

Sent by:
To
teitac-committee- "'TEITAC Audio/Video
Subcommittee'"
= EMAIL ADDRESS REMOVED = < = EMAIL ADDRESS REMOVED = >,

ac.org "'TEITAC Telecommunications

Subcommittee'"

< = EMAIL ADDRESS REMOVED = >,

11/06/2006 06:29 "'TEITAC Committee'"

AM
< = EMAIL ADDRESS REMOVED = >

cc


Please respond to
Subject
TEITAC Committee [teitac-committee] Meeting
Schedule
<teitac-committee Collision

@list.teitac.org>















The calendar shows 2 meetings I'm planning on attending today happening
at
the same time (see http://teitac.org/calendar/). Chairs - please
negotiate
these and change one of them? Thanks,

Rex

Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

From: Yamada@TOYO-UNIV
Date: Wed, Dec 06 2006 3:30 AM
Subject: Meeting Schedule

Tim,



At the previous meeting, we discussed about meeting schedule (especially
about a possibility of March meeting coincides with CSUN). And we concluded
that the schedule will be decided after consultation among co-chairs of the
parent and sub-committees and secretary.



The Wiki calendar shows that the February meeting will be from 6 to 8, and
the March meeting will be from 27 to 29. Is it the conclusion of the
consultation? Or will you change the meeting schedule?



I would like to ask you to announce the final conclusion ASAP so that we can
plan our trip from LA to DC, from DC to LA or LA only.



Hajime Yamada

From: Diane Golden
Date: Thu, Dec 07 2006 8:30 AM
Subject: Re: Meeting Schedule

Also can we get finalization on start/end times on the February meeting?
For some of us, airfare costs increase exponentially if we don't get
reservations as far in advance as possible.

Thanks,
Diane

Diane Cordry Golden, Ph.D., Director
Missouri Assistive Technology
816/350-5280 (direct voice)
= EMAIL ADDRESS REMOVED =
www.at.mo.gov

-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ]On Behalf Of
Yamada@TOYO-UNIV
Sent: Wednesday, December 06, 2006 4:24 AM
To: 'TEITAC Committee'
Subject: [teitac-committee] Meeting Schedule


Tim,



At the previous meeting, we discussed about meeting schedule (especially
about a possibility of March meeting coincides with CSUN). And we concluded
that the schedule will be decided after consultation among co-chairs of the
parent and sub-committees and secretary.



The Wiki calendar shows that the February meeting will be from 6 to 8, and
the March meeting will be from 27 to 29. Is it the conclusion of the
consultation? Or will you change the meeting schedule?



I would like to ask you to announce the final conclusion ASAP so that we can
plan our trip from LA to DC, from DC to LA or LA only.



Hajime Yamada

From: Whitney Quesenbery
Date: Thu, Dec 07 2006 9:05 AM
Subject: Re: Meeting Schedule

<html>
<body>
Is Feb 6-8 the third/next meeting? I had a note that included tentative
dates in January as well.<br><br>
At 10:31 AM 12/7/2006, Diane Golden wrote:<br><br>
<blockquote type=cite class=cite cite="">
<font face="verdana" size=2 color="#0000FF">Also can we get finalization
on start/end times on the February meeting?&nbsp; For some of us, airfare
costs increase exponentially if we don't get reservations as far in
advance as possible.<br>
</font>&nbsp;<br>
<font face="verdana" size=2 color="#0000FF">Thanks,<br>
Diane <br>
</font>&nbsp;<br>
<font face="verdana" size=2>Diane Cordry Golden, Ph.D., Director</font>
<br>
<font face="verdana" size=2>Missouri Assistive Technology</font> <br>
<font face="verdana" size=2>816/350-5280 (direct voice)</font> <br>
<font face="verdana" size=2> = EMAIL ADDRESS REMOVED = </font> <br>
<font face="verdana" size=2><a href="http://www.at.mo.gov">
www.at.mo.gov</a></font> <br>
&nbsp;<br>
<font face="tahoma" size=2>-----Original Message-----<br>
<b>From:</b> = EMAIL ADDRESS REMOVED =
[<a href="mailto: = EMAIL ADDRESS REMOVED = " eudora="autourl">
mailto: = EMAIL ADDRESS REMOVED = </a>]<b>On Behalf Of
</b>Yamada@TOYO-UNIV<br>
<b>Sent:</b> Wednesday, December 06, 2006 4:24 AM<br>
<b>To:</b> 'TEITAC Committee'<br>
<b>Subject:</b> [teitac-committee] Meeting Schedule<br><br>
</font>Tim,<br>
&nbsp;<br>
At the previous meeting, we discussed about meeting schedule (especially
about a possibility of March meeting coincides with CSUN). And we
concluded that the schedule will be decided after consultation among
co-chairs of the parent and sub-committees and secretary.<br>
&nbsp;<br>
The Wiki calendar shows that the February meeting will be from 6 to 8,
and the March meeting will be from 27 to 29. Is it the conclusion of the
consultation? Or will you change the meeting schedule?<br>
&nbsp;<br>
I would like to ask you to announce the final conclusion ASAP so that we
can plan our trip from LA to DC, from DC to LA or LA only.<br>
&nbsp;<br>
Hajime Yamada<br>
&nbsp;<br>
&nbsp;<br>

From: Creagan Tim
Date: Thu, Dec 07 2006 11:40 AM
Subject: Re: Meeting Schedule

Hello Everyone,



Just wanted to let you all know our current status on future TEITAC meeting dates:



As of the end of the Sept. 2006, TEITAC meeting, the Committee projected the following meeting schedule:

* November 8-9, 2006; [HELD]
* February 6-8, 2007; [To be held on those dates; still finalizing a venue. It will be in DC]
* March 27-29, 2007; [Under discussion. See THIS email]
* May 22-25, 2007; [Under discussion. See THIS email]
* and July 25-27, 2007. [WILL CHANGE. Possibly Sept. 2007. See this email.]

March 2007 Meeting:

The Access Board staff and co-chairs are going to finalize dates for March 2006. Professor Yamada is correct in that we discussed some possible changes to the March 2007 date, since both CSUN and CTIA have conferences in that month. This was discussed at the teleconference with the co-chairs, subcommittee co-chairs and Access Board staff on 11/17/2006.

* As a possible solution, we MIGHT consider moving the March 2007 meeting date to April 2007. On the other hand, we MIGHT leave the proposed March 2007 date right where it is currently (March 27-29, 2007) The consensus of the subcommittee co-chairs on the teleconference was to let AB staff and the co-chairs finalize the March 2007 date. [Mike and Jim, I will contact you under separate cover re: when AB staff and you talk. Thanks.]

IF anyone has any violent objections to moving the March meeting to April 2007 (avoiding any religious holidays, etc. to the extent that we can identify any potential conflicts) PLEASE LET ME KNOW, IDENTIFYING ANY CONFLICTS. [I already have the religious holidays noted. Anything else? ]



IF YOU DON'T OBJECT TO THE IDEA OF HAVING A MEETING IN APRIL, YOU DON'T NEED TO SAY ANYTHING.



N0NE OF THIS IS YET SET IN STONE. Until we affirmatively say something, assume that the original meeting dates as announced at the end of the Sept. 2006 TEITAC meeting apply



MAY 2007:

* In addition, we MAY shift the MAY meeting date [currently May 22-25, 2007] by one day, to avoid travel on the Friday before Memorial Day weekend. ;
* ;
* WE WILL ANNOUNCE ANY CHANGE to the MAY 2007 Dates if/when they happen.
* Milestone at the MAY 2007 meeting: At that time, the Committee will take a look at the status of the Committee's work, and give the Access Board staff some idea of whether or not they might want MORE meeting dates. That is, would the Committee want MORE working meetings after May 2007, or would the report be ready at the first meeting after the May 2007 meeting? [Currently the 6th meeting is set for July 25-27, 2007, but this date will change. See below]
*

JULY 2007:

* The original meeting date is July 25-27, 2007. This WILL change. There WILL NOT be a meeting in July 2007. Why? The Access Board decided at their November 2007 to hold an out of town meeting in Denver, CO in July 2007. The most likely time for a 6th meeting will be in SEPTEMBER 2007. WE are looking at Sept. 2007 dates now.



Thank you for your forbearance. We will communicate any revised dates AS SOON AS POSSIBLE.

Tim Creagan







Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED =



"Thank you for your questions concerning section 508 of the Rehabilitation Act Amendments of 1998. Section 508 authorizes the Access Board to provide technical assistance to individuals and Federal departments and agencies concerning the requirements of this section. This technical assistance is intended solely as informal guidance; it is not a determination of the legal rights or responsibilities of entities subject to section 508."

From: Andrew Kirkpatrick
Date: Thu, Dec 07 2006 11:45 AM
Subject: Re: Meeting Schedule

*
February 6-8, 2007; [To be held on those dates; still finalizing
a venue. It will be in DC]


Not sure if this has been voiced, but I hope that internet access is
regarded as a requirement for all future venues.
AWK

From: Creagan Tim
Date: Thu, Dec 07 2006 11:50 AM
Subject: Re: Meeting Schedule

We DID mention the internet access issue at the 11/17/06 call. To the
extent possible, it will be provided. Sometimes, because of the rules
for that particular venue, we cannot guarantee it. Case in point: Dept.
of ED would NOT guarantee that we would have internet access for
everyone, since they only had one "official" link in the room, which we
used at the podium for presentations. As things worked out, however, I
think people's wishes were met.



Thanks for the comment.



Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED =



"Thank you for your questions concerning section 508 of the
Rehabilitation Act Amendments of 1998. Section 508 authorizes the
Access Board to provide technical assistance to individuals and Federal
departments and agencies concerning the requirements of this section.
This technical assistance is intended solely as informal guidance; it is
not a determination of the legal rights or responsibilities of entities
subject to section 508."

From: Mary Frances Laughton
Date: Thu, Dec 07 2006 12:20 PM
Subject: Re: Meeting Schedule

THe JTC1-SWG-A is meeting in OSLO in April and Easter is in there. If we
can stick with the March dates (if they are doable), I would stick with
those dates.

Mary Frances

At 13:44 2006-12-07 -0500, Creagan Tim wrote:
>Content-class: urn:content-classes:message
>Content-Type: multipart/alternative;
> boundary="----_=_NextPart_001_01C71A2F.B5F3A3BC"
>
>xmlns:ns0="urn:schemas-microsoft-com:office:smarttags">
>
>We DID mention the internet access issue at the 11/17/06 call. To the
>extent possible, it will be provided. Sometimes, because of the rules for
>that particular venue, we cannot guarantee it. Case in point: Dept. of ED
>would NOT guarantee that we would have internet access for everyone, since
>they only had one official link in the room, which we used at the podium
>for presentations. As things worked out, however, I think people s wishes
>were met.
>
>
>
>Thanks for the comment.
>
>
>
>Timothy P. Creagan
>
>Senior Accessibility Specialist
>
>U.S. Access Board
>
>1331 F Street, N.W.
>
>Suite 1000
>
>Washington, DC 20004-1111
>
>
>
>202-272-0016 (V); 1-(800) 872-2253 (V)
>
>202-272-0082 (TTY);1-800-993-2822 (TTY)
>
>202-272-0081 (Fax)
>
><mailto: = EMAIL ADDRESS REMOVED = > = EMAIL ADDRESS REMOVED =
>
>
>
>"Thank you for your questions concerning section 508 of the Rehabilitation
>Act Amendments of 1998. Section 508 authorizes the Access Board to
>provide technical assistance to individuals and Federal departments and
>agencies concerning the requirements of this section. This technical
>assistance is intended solely as informal guidance; it is not a
>determination of the legal rights or responsibilities of entities subject
>to section 508."
>
>----------
>From: = EMAIL ADDRESS REMOVED =
>[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Andrew
>Kirkpatrick
>Sent: Thursday, December 07, 2006 1:38 PM
>To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
>Cc: Jim Tobias @ Inclusive Technologies; Fairhall Lisa; Baquis David ;
>Bailey Bruce; Capozzi David
>Subject: Re: [teitac-committee] Meeting Schedule
>
>
> * February 6-8, 2007; [To be held on those dates; still finalizing a
> venue. It will be in DC]
>
>
>Not sure if this has been voiced, but I hope that internet access is
>regarded as a requirement forall future venues.
>
>AWK
>

From: Takemura, Michael (HP Accessibility)
Date: Thu, Dec 07 2006 12:30 PM
Subject: Meeting Schedule

Echo Mary Frances' request to stick to March dates (post CSUN 27-29
March in L.A. ? or D.C. ?);

... due to April (Easter, 8 April; and JTC1 SWG-A in Oslo 23-27 April).

Michael

Michael Takemura
Director, HP Accessibility Program Office
http://www.hp.com/accessibility
Phone: 281 518-0739 (Central Time CDT/CST)
Email: = EMAIL ADDRESS REMOVED =


-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Mary
Frances Laughton
Sent: Thursday, December 07, 2006 12:47 PM
To: TEITAC Committee; TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Jim Tobias @ Inclusive Technologies; Fairhall Lisa; Baquis David;
Bailey Bruce; Capozzi David
Subject: Re: [teitac-committee] Meeting Schedule

THe JTC1-SWG-A is meeting in OSLO in April and Easter is in there. If we
can stick with the March dates (if they are doable), I would stick with
those dates.

Mary Frances


------------------------------------------------------------------------
--------
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Creagan
Tim
Sent: Thursday, December 07, 2006 12:36 PM
To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Fairhall Lisa; Capozzi David; Baquis David; Creagan Tim; Jim Tobias
@ Inclusive Technologies; Bailey Bruce
Subject: Re: [teitac-committee] Meeting Schedule

Hello Everyone,

Just wanted to let you all know our current status on future TEITAC
meeting dates:

As of the end of the Sept. 2006, TEITAC meeting, the Committee projected
the following meeting schedule:

November 8-9, 2006; [HELD]
February 6-8, 2007; [To be held on those dates; still finalizing a
venue. It will be in DC]
March 27-29, 2007; [Under discussion. See THIS email]
May 22-25, 2007; [Under discussion. See THIS email]
and July 25-27, 2007. [WILL CHANGE. Possibly Sept. 2007. See this
email.]
March 2007 Meeting:

The Access Board staff and co-chairs are going to finalize dates for
March 2006. Professor Yamada is correct in that we discussed some
possible changes to the March 2007 date, since both CSUN and CTIA have
conferences in that month. This was discussed at the teleconference with
the co-chairs, subcommittee co-chairs and Access Board staff on
11/17/2006.

As a possible solution, we MIGHT consider moving the March 2007 meeting
date to April 2007. On the other hand, we MIGHT leave the proposed
March 2007 date right where it is currently (March 27-29, 2007) The
consensus of the subcommittee co-chairs on the teleconference was to let
AB staff and the co-chairs finalize the March 2007 date. [Mike and Jim,
I will contact you under separate cover re: when AB staff and you talk.
Thanks.]
IF anyone has any violent objections to moving the March meeting to
April 2007 (avoiding any religious holidays, etc. to the extent that we
can identify any potential conflicts) PLEASE LET ME KNOW, IDENTIFYING
ANY CONFLICTS. [I already have the religious holidays noted. Anything
else? ]

IF YOU DON'T OBJECT TO THE IDEA OF HAVING A MEETING IN APRIL, YOU DON'T
NEED TO SAY ANYTHING.

N0NE OF THIS IS YET SET IN STONE. Until we affirmatively say something,
assume that the original meeting dates as announced at the end of the
Sept. 2006 TEITAC meeting apply


MAY 2007:

In addition, we MAY shift the MAY meeting date [currently May 22-25,
2007] by one day, to avoid travel on the Friday before Memorial Day
weekend. ;
;
WE WILL ANNOUNCE ANY CHANGE to the MAY 2007 Dates if/when they happen.
Milestone at the MAY 2007 meeting: At that time, the Committee will
take a look at the status of the Committee's work, and give the Access
Board staff some idea of whether or not they might want MORE meeting
dates. That is, would the Committee want MORE working meetings after
May 2007, or would the report be ready at the first meeting after the
May 2007 meeting? [Currently the 6th meeting is set for July 25-27,
2007, but this date will change. See below]

JULY 2007:

The original meeting date is July 25-27, 2007. This WILL change. There
WILL NOT be a meeting in July 2007. Why? The Access Board decided at
their November 2007 to hold an out of town meeting in Denver, CO in July
2007. The most likely time for a 6th meeting will be in SEPTEMBER 2007.
WE are looking at Sept. 2007 dates now.


Thank you for your forbearance. We will communicate any revised dates AS
SOON AS POSSIBLE.

Tim Creagan


Timothy P. Creagan
Senior Accessibility Specialist
U.S. Access Board
1331 F Street, N.W.
Suite 1000
Washington, DC 20004-1111

202-272-0016 (V); 1-(800) 872-2253 (V)
202-272-0082 (TTY);1-800-993-2822 (TTY)
202-272-0081 (Fax)
= EMAIL ADDRESS REMOVED =


"Thank you for your questions concerning section 508 of the
Rehabilitation Act Amendments of 1998. Section 508 authorizes the
Access Board to provide technical assistance to individuals and Federal
departments and agencies concerning the requirements of this section.
This technical assistance is intended solely as informal guidance; it is
not a determination of the legal rights or responsibilities of entities
subject to section 508."


------------------------------------------------------------------------
--------

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Whitney
Quesenbery
Sent: Thursday, December 07, 2006 11:01 AM
To: = EMAIL ADDRESS REMOVED = ; TEITAC Committee
Subject: Re: [teitac-committee] Meeting Schedule

Is Feb 6-8 the third/next meeting? I had a note that included tentative
dates in January as well.

At 10:31 AM 12/7/2006, Diane Golden wrote:


Also can we get finalization on start/end times on the February meeting?
For some of us, airfare costs increase exponentially if we don't get
reservations as far in advance as possible.

Thanks,
Diane

Diane Cordry Golden, Ph.D., Director
Missouri Assistive Technology
816/350-5280 (direct voice)
= EMAIL ADDRESS REMOVED =
www.at.mo.gov

-----Original Message-----
From: = EMAIL ADDRESS REMOVED = [
mailto: = EMAIL ADDRESS REMOVED = ]On Behalf Of
Yamada@TOYO-UNIV
Sent: Wednesday, December 06, 2006 4:24 AM
To: 'TEITAC Committee'
Subject: [teitac-committee] Meeting Schedule

Tim,

At the previous meeting, we discussed about meeting schedule (especially
about a possibility of March meeting coincides with CSUN). And we
concluded that the schedule will be decided after consultation among
co-chairs of the parent and sub-committees and secretary.

The Wiki calendar shows that the February meeting will be from 6 to 8,
and the March meeting will be from 27 to 29. Is it the conclusion of the
consultation? Or will you change the meeting schedule?

I would like to ask you to announce the final conclusion ASAP so that we
can plan our trip from LA to DC, from DC to LA or LA only.

Hajime Yamada

From: Salaets, Ken
Date: Thu, Dec 07 2006 1:15 PM
Subject: Re: Meeting Schedule

Well Tim, I don't have an violent objections per se, but I also wish to be associated with Mary Frances' response. April is already shaping up to be a very hectic month, so I support a March session.

Thanks, Tim, and happy holidays to all.

Ken Salaets
I T I


-----Original Message-----
From: = EMAIL ADDRESS REMOVED = [mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Creagan Tim
Sent: Thursday, December 07, 2006 1:36 PM
To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Fairhall Lisa; Capozzi David; Baquis David; Creagan Tim; Jim Tobias @ Inclusive Technologies; Bailey Bruce
Subject: Re: [teitac-committee] Meeting Schedule



Hello Everyone,



Just wanted to let you all know our current status on future TEITAC meeting dates:



As of the end of the Sept. 2006, TEITAC meeting, the Committee projected the following meeting schedule:

* November 8-9, 2006; [HELD]
* February 6-8, 2007; [To be held on those dates; still finalizing a venue. It will be in DC]
* March 27-29, 2007; [Under discussion. See THIS email]
* May 22-25, 2007; [Under discussion. See THIS email]
* and July 25-27, 2007. [WILL CHANGE. Possibly Sept. 2007. See this email.]

March 2007 Meeting:

The Access Board staff and co-chairs are going to finalize dates for March 2006. Professor Yamada is correct in that we discussed some possible changes to the March 2007 date, since both CSUN and CTIA have conferences in that month. This was discussed at the teleconference with the co-chairs, subcommittee co-chairs and Access Board staff on 11/17/2006.

* As a possible solution, we MIGHT consider moving the March 2007 meeting date to April 2007. On the other hand, we MIGHT leave the proposed March 2007 date right where it is currently (March 27-29, 2007) The consensus of the subcommittee co-chairs on the teleconference was to let AB staff and the co-chairs finalize the March 2007 date. [Mike and Jim, I will contact you under separate cover re: when AB staff and you talk. Thanks.]

IF anyone has any violent objections to moving the March meeting to April 2007 (avoiding any religious holidays, etc. to the extent that we can identify any potential conflicts) PLEASE LET ME KNOW, IDENTIFYING ANY CONFLICTS. [I already have the religious holidays noted. Anything else? ]



IF YOU DON'T OBJECT TO THE IDEA OF HAVING A MEETING IN APRIL, YOU DON'T NEED TO SAY ANYTHING.



N0NE OF THIS IS YET SET IN STONE. Until we affirmatively say something, assume that the original meeting dates as announced at the end of the Sept. 2006 TEITAC meeting apply



MAY 2007:

* In addition, we MAY shift the MAY meeting date [currently May 22-25, 2007] by one day, to avoid travel on the Friday before Memorial Day weekend. ;
* ;
* WE WILL ANNOUNCE ANY CHANGE to the MAY 2007 Dates if/when they happen.
* Milestone at the MAY 2007 meeting: At that time, the Committee will take a look at the status of the Committee's work, and give the Access Board staff some idea of whether or not they might want MORE meeting dates. That is, would the Committee want MORE working meetings after May 2007, or would the report be ready at the first meeting after the May 2007 meeting? [Currently the 6th meeting is set for July 25-27, 2007, but this date will change. See below]
*

JULY 2007:

* The original meeting date is July 25-27, 2007. This WILL change. There WILL NOT be a meeting in July 2007. Why? The Access Board decided at their November 2007 to hold an out of town meeting in Denver, CO in July 2007. The most likely time for a 6th meeting will be in SEPTEMBER 2007. WE are looking at Sept. 2007 dates now.



Thank you for your forbearance. We will communicate any revised dates AS SOON AS POSSIBLE.

Tim Creagan







Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED =



"Thank you for your questions concerning section 508 of the Rehabilitation Act Amendments of 1998. Section 508 authorizes the Access Board to provide technical assistance to individuals and Federal departments and agencies concerning the requirements of this section. This technical assistance is intended solely as informal guidance; it is not a determination of the legal rights or responsibilities of entities subject to section 508."

From: Andrew Kirkpatrick
Date: Thu, Dec 07 2006 1:35 PM
Subject: Re: Meeting Schedule

I think that we need to do better than "we'll get it if we can get it".
Electricity is a requirement, chairs are a requirement, and internet
access should be a requirement. If we can't have internet access at the
site, we shouldn't consider that site. Many of the participants need to
be able to communicate back with an office and even to chat with
co-workers to get opinions on what is going on in the meeting. Internet
access needs to exist and needs to be not so tightly locked down that
email and chat are prohibited - we need these tools for a productive and
efficient process!

AWK

From: Randy Marsden
Date: Thu, Dec 07 2006 1:55 PM
Subject: Re: Meeting Schedule

I absolutely concur with Andrew¹s statements.

-Randy
ATIA
>
> From: "Andrew Kirkpatrick" < = EMAIL ADDRESS REMOVED = >
> Reply-To: TEITAC Committee < = EMAIL ADDRESS REMOVED = >
> Date: Thu, 7 Dec 2006 12:29:51 -0800
> To: "TEITAC Committee" < = EMAIL ADDRESS REMOVED = >,
> < = EMAIL ADDRESS REMOVED = >
> Cc: "Jim Tobias @ Inclusive Technologies" < = EMAIL ADDRESS REMOVED = >, Fairhall
> Lisa < = EMAIL ADDRESS REMOVED = >, Baquis David < = EMAIL ADDRESS REMOVED = >,
> Bailey Bruce < = EMAIL ADDRESS REMOVED = >, Capozzi David
> < = EMAIL ADDRESS REMOVED = >
> Subject: Re: [teitac-committee] Meeting Schedule
>

> I think that we need to do better than "we'll get it if we can get it".
> Electricity is a requirement, chairs are a requirement, and internet access
> should be a requirement. If we can't have internet access at the site, we
> shouldn't consider that site. Many of the participants need to be able to
> communicate back with an office and even to chat with co-workers to get
> opinions on what is going on in the meeting. Internet access needs to exist
> and needs to be not so tightly locked down that email and chat are prohibited
> - we need these tools for a productive and efficient process!
>
> AWK
>
>
> From: = EMAIL ADDRESS REMOVED =
> [mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Creagan Tim
> Sent: Thursday, December 07, 2006 1:44 PM
> To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
> Cc: Capozzi David; Fairhall Lisa; Baquis David; Bailey Bruce; Jim Tobias @
> Inclusive Technologies
> Subject: Re: [teitac-committee] Meeting Schedule
>
> We DID mention the internet access issue at the 11/17/06 call. To the extent
> possible, it will be provided. Sometimes, because of the rules for that
> particular venue, we cannot guarantee it. Case in point: Dept. of ED would
> NOT guarantee that we would have internet access for everyone, since they only
> had one ³official² link in the room, which we used at the podium for
> presentations. As things worked out, however, I think people¹s wishes were
> met.
>
>
>
> Thanks for the comment.
>
>
>
> Timothy P. Creagan
>
> Senior Accessibility Specialist
>
> U.S. Access Board
>
> 1331 F Street, N.W.
>
> Suite 1000
>
> Washington, DC 20004-1111
>
>
>
> 202-272-0016 (V); 1-(800) 872-2253 (V)
>
> 202-272-0082 (TTY);1-800-993-2822 (TTY)
>
> 202-272-0081 (Fax)
>
> = EMAIL ADDRESS REMOVED =
>
>
>
> "Thank you for your questions concerning section 508 of the Rehabilitation Act
> Amendments of 1998. Section 508 authorizes the Access Board to provide
> technical assistance to individuals and Federal departments and agencies
> concerning the requirements of this section. This technical assistance is
> intended solely as informal guidance; it is not a determination of the legal
> rights or responsibilities of entities subject to section 508."
>
>
> From: = EMAIL ADDRESS REMOVED =
> [mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Andrew
> Kirkpatrick
> Sent: Thursday, December 07, 2006 1:38 PM
> To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
> Cc: Jim Tobias @ Inclusive Technologies; Fairhall Lisa; Baquis David ; Bailey
> Bruce; Capozzi David
> Subject: Re: [teitac-committee] Meeting Schedule
>
>
> * February 6-8, 2007; [To be held on those dates; still finalizing a venue. It
> will be in DC]
>
>
> Not sure if this has been voiced, but I hope that internet access is regarded
> as a requirement forall future venues.
>
> AWK
>
>
>

From: Jessica M. Brodey
Date: Thu, Dec 07 2006 2:10 PM
Subject: Re: Meeting Schedule

I would like to second Andrew's statement regarding Internet access - with
sufficient time to plan, Internet access should be a minimum requirement for
a venue. It does facilitate communication at the meetings in a positive
manner.



I would also strongly encourage the Access Board to reserve a block of rooms
at a nearby hotel (or hotels) at the government rate to make it easier for
those of us traveling to meetings on a tight budget. With this many months
in advance to plan, securing a block of rooms at the government rate should
be possible for all of the remaining meetings, as should picking venues with
Internet access.



Jessica Brodey

From: Dane Snowden
Date: Thu, Dec 07 2006 6:30 PM
Subject: Re: Meeting Schedule

CTIA has its large conference in Orlando for the wireless industry the same exact days as the scheduled March meeting. We would support moving the March meeting to another time.

Dane

From: Yamada@TOYO-UNIV
Date: Thu, Dec 07 2006 9:55 PM
Subject: Re: Meeting Schedule

Tim, Jim and Mike,



I can attend the February meeting without problem. In the case the March
meeting will be held at the scheduled dates, I can attend as well.



>From April, I will be in Tokyo teaching lecture courses (I return my normal
job), therefore, attending the April meeting is impossible. However, it is
lucky for me to find no problem to attend May, July and September meetings
since those dates are in the semester breaks.



Regards,



Hajime Yamada

From: Andi Snow-Weaver
Date: Fri, Dec 08 2006 6:45 AM
Subject: Re: Meeting Schedule

Tim,

I have no problem with the March date but have the same JTC-1 meeting in
Norway the week of April 23rd that others have mentioned. I have no other
conflicts in April.

I also agree that Internet access is a must have for future meetings.

Andi

From: Curtis Chong
Date: Fri, Dec 08 2006 8:40 AM
Subject: Re: Meeting Schedule

Tim:

I gather then that February 6-8 is for certain and that travel planning can commence?

Cordially,

Curtis Chong

From: Rex Lint
Date: Fri, Dec 08 2006 9:40 AM
Subject: Re: Meeting Schedule

Hi Tim,



I saw no response to Yamada's query regarding LA vs DC. I don't have
funding for west coast venues, per the initial announcement that all
meetings would be in DC, so I need an early heads-up if there's a west coast
meeting to negotiate "change in scope" contract changes!



I agree we need a firm commitment on access to internet. I DISAGREE that
people's wishes were met at the DoEd- I couldn't get adequate connection,
and was surprised that access was not a requirement for the venue to begin
with.



Best for Holidays,



Rex



Rex Lint, Consultant
Chair, Section 508 Working Group
Information Technology Association of America
PH: 603-860-7651, FAX: 603-882-6612

_____

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Creagan Tim
Sent: Thursday, December 07, 2006 1:44 PM
To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Capozzi David; Fairhall Lisa; Baquis David; Bailey Bruce; Jim Tobias @
Inclusive Technologies
Subject: Re: [teitac-committee] Meeting Schedule



We DID mention the internet access issue at the 11/17/06 call. To the
extent possible, it will be provided. Sometimes, because of the rules for
that particular venue, we cannot guarantee it. Case in point: Dept. of ED
would NOT guarantee that we would have internet access for everyone, since
they only had one "official" link in the room, which we used at the podium
for presentations. As things worked out, however, I think people's wishes
were met.



Thanks for the comment.



Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED =



"Thank you for your questions concerning section 508 of the Rehabilitation
Act Amendments of 1998. Section 508 authorizes the Access Board to provide
technical assistance to individuals and Federal departments and agencies
concerning the requirements of this section. This technical assistance is
intended solely as informal guidance; it is not a determination of the legal
rights or responsibilities of entities subject to section 508."

_____

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Andrew
Kirkpatrick
Sent: Thursday, December 07, 2006 1:38 PM
To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Jim Tobias @ Inclusive Technologies; Fairhall Lisa; Baquis David ;
Bailey Bruce; Capozzi David
Subject: Re: [teitac-committee] Meeting Schedule



* February 6-8, 2007; [To be held on those dates; still finalizing a
venue. It will be in DC]



Not sure if this has been voiced, but I hope that internet access is
regarded as a requirement forall future venues.

AWK

From: Takemura, Michael (HP Accessibility)
Date: Fri, Dec 08 2006 10:05 AM
Subject: Meeting Schedule

Tim...

Did you intend for the May meeting to be 4 days (22-25 May) where all other
meetings are 3 days ?

Michael

From: Creagan Tim
Date: Fri, Dec 08 2006 12:15 PM
Subject: Re: Meeting Schedule

Yes. Feb. 6-89, 2007 is set.



Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED =



"Thank you for your questions concerning section 508 of the Rehabilitation Act Amendments of 1998. Section 508 authorizes the Access Board to provide technical assistance to individuals and Federal departments and agencies concerning the requirements of this section. This technical assistance is intended solely as informal guidance; it is not a determination of the legal rights or responsibilities of entities subject to section 508."

From: Diane Golden
Date: Fri, Dec 08 2006 12:55 PM
Subject: Re: Meeting Schedule

I assume that is Feb 6-8, do we have a general start and end time?
Diane

Diane Cordry Golden, Ph.D., Director
Missouri Assistive Technology
816/350-5280 (direct voice)
= EMAIL ADDRESS REMOVED =
www.at.mo.gov <http://www.at.mo.gov>

-----Original Message-----
From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ]On Behalf Of Creagan Tim
Sent: Friday, December 08, 2006 12:15 PM
To: TEITAC Committee
Subject: Re: [teitac-committee] Meeting Schedule



Yes. Feb. 6-89, 2007 is set.



Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED = <mailto: = EMAIL ADDRESS REMOVED = >



"Thank you for your questions concerning section 508 of the Rehabilitation
Act Amendments of 1998. Section 508 authorizes the Access Board to provide
technical assistance to individuals and Federal departments and agencies
concerning the requirements of this section. This technical assistance is
intended solely as informal guidance; it is not a determination of the legal
rights or responsibilities of entities subject to section 508."

_____

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Curtis Chong
Sent: Friday, December 08, 2006 10:38 AM
To: TEITAC Committee
Subject: Re: [teitac-committee] Meeting Schedule



Tim:



I gather then that February 6-8 is for certain and that travel planning can
commence?



Cordially,



Curtis Chong



_____

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Creagan Tim
Sent: Thursday, December 07, 2006 12:36 PM
To: TEITAC Committee; = EMAIL ADDRESS REMOVED =
Cc: Fairhall Lisa; Capozzi David; Baquis David; Creagan Tim; Jim Tobias @
Inclusive Technologies; Bailey Bruce
Subject: Re: [teitac-committee] Meeting Schedule

Hello Everyone,



Just wanted to let you all know our current status on future TEITAC meeting
dates:



As of the end of the Sept. 2006, TEITAC meeting, the Committee projected the
following meeting schedule:

* November 8-9, 2006; [HELD]

* February 6-8, 2007; [To be held on those dates; still finalizing a
venue. It will be in DC]

* March 27-29, 2007; [Under discussion. See THIS email]

* May 22-25, 2007; [Under discussion. See THIS email]

* and July 25-27, 2007. [WILL CHANGE. Possibly Sept. 2007. See this
email.]

March 2007 Meeting:

The Access Board staff and co-chairs are going to finalize dates for March
2006. Professor Yamada is correct in that we discussed some possible changes
to the March 2007 date, since both CSUN and CTIA have conferences in that
month. This was discussed at the teleconference with the co-chairs,
subcommittee co-chairs and Access Board staff on 11/17/2006.

* As a possible solution, we MIGHT consider moving the March 2007
meeting date to April 2007. On the other hand, we MIGHT leave the proposed
March 2007 date right where it is currently (March 27-29, 2007) The
consensus of the subcommittee co-chairs on the teleconference was to let AB
staff and the co-chairs finalize the March 2007 date. [Mike and Jim, I will
contact you under separate cover re: when AB staff and you talk. Thanks.]

IF anyone has any violent objections to moving the March meeting to April
2007 (avoiding any religious holidays, etc. to the extent that we can
identify any potential conflicts) PLEASE LET ME KNOW, IDENTIFYING ANY
CONFLICTS. [I already have the religious holidays noted. Anything else? ]



IF YOU DON'T OBJECT TO THE IDEA OF HAVING A MEETING IN APRIL, YOU DON'T NEED
TO SAY ANYTHING.



N0NE OF THIS IS YET SET IN STONE. Until we affirmatively say something,
assume that the original meeting dates as announced at the end of the Sept.
2006 TEITAC meeting apply



MAY 2007:

* In addition, we MAY shift the MAY meeting date [currently May 22-25,
2007] by one day, to avoid travel on the Friday before Memorial Day weekend.
;

* ;

* WE WILL ANNOUNCE ANY CHANGE to the MAY 2007 Dates if/when they
happen.

* Milestone at the MAY 2007 meeting: At that time, the Committee will
take a look at the status of the Committee's work, and give the Access Board
staff some idea of whether or not they might want MORE meeting dates. That
is, would the Committee want MORE working meetings after May 2007, or would
the report be ready at the first meeting after the May 2007 meeting?
[Currently the 6th meeting is set for July 25-27, 2007, but this date will
change. See below]

*

JULY 2007:

* The original meeting date is July 25-27, 2007. This WILL change.
There WILL NOT be a meeting in July 2007. Why? The Access Board decided at
their November 2007 to hold an out of town meeting in Denver, CO in July
2007. The most likely time for a 6th meeting will be in SEPTEMBER 2007. WE
are looking at Sept. 2007 dates now.



Thank you for your forbearance. We will communicate any revised dates AS
SOON AS POSSIBLE.

Tim Creagan







Timothy P. Creagan

Senior Accessibility Specialist

U.S. Access Board

1331 F Street, N.W.

Suite 1000

Washington, DC 20004-1111



202-272-0016 (V); 1-(800) 872-2253 (V)

202-272-0082 (TTY);1-800-993-2822 (TTY)

202-272-0081 (Fax)

= EMAIL ADDRESS REMOVED = <mailto: = EMAIL ADDRESS REMOVED = >



"Thank you for your questions concerning section 508 of the Rehabilitation
Act Amendments of 1998. Section 508 authorizes the Access Board to provide
technical assistance to individuals and Federal departments and agencies
concerning the requirements of this section. This technical assistance is
intended solely as informal guidance; it is not a determination of the legal
rights or responsibilities of entities subject to section 508."

_____

From: = EMAIL ADDRESS REMOVED =
[mailto: = EMAIL ADDRESS REMOVED = ] On Behalf Of Whitney
Quesenbery
Sent: Thursday, December 07, 2006 11:01 AM
To: = EMAIL ADDRESS REMOVED = ; TEITAC Committee
Subject: Re: [teitac-committee] Meeting Schedule



Is Feb 6-8 the third/next meeting? I had a note that included tentative
dates in January as well.

At 10:31 AM 12/7/2006, Diane Golden wrote:



Also can we get finalization on start/end times on the February meeting?
For some of us, airfare costs increase exponentially if we don't get
reservations as far in advance as possible.

Thanks,
Diane

Diane Cordry Golden, Ph.D., Director
Missouri Assistive Technology
816/350-5280 (direct voice)
= EMAIL ADDRESS REMOVED =
www.at.mo.gov <http://www.at.mo.gov>

-----Original Message-----
From: = EMAIL ADDRESS REMOVED = [
<mailto: = EMAIL ADDRESS REMOVED = >
mailto: = EMAIL ADDRESS REMOVED = ]On Behalf Of
Yamada@TOYO-UNIV
Sent: Wednesday, December 06, 2006 4:24 AM
To: 'TEITAC Committee'
Subject: [teitac-committee] Meeting Schedule

Tim,

At the previous meeting, we discussed about meeting schedule (especially
about a possibility of March meeting coincides with CSUN). And we concluded
that the schedule will be decided after consultation among co-chairs of the
parent and sub-committees and secretary.

The Wiki calendar shows that the February meeting will be from 6 to 8, and
the March meeting will be from 27 to 29. Is it the conclusion of the
consultation? Or will you change the meeting schedule?

I would like to ask you to announce the final conclusion ASAP so that we can
plan our trip from LA to DC, from DC to LA or LA only.

Hajime Yamada

WebAIM is an initiative of: